MAX HÖFE

MAXVORSTADT

Under construction

Planning phase

Building permit

Shell construction completed

Construction phase

Ready for occupancy

Completion

Right here in the heart of Munich, we are building the MAX HÖFE complex in the Maxvorstadt district for people who not only want to live in the city, but with it as well. MAX HÖFE: the difference between a good location and a first-class address.


USE THE TAX ADVANTAGE

As part of the passed Growth Opportunities Act, the MAX HÖFE are subsidized residential properties and therefore offer considerable tax advantages for investors. When purchasing the smallest 2-room apartment, for example, you can save over EUR 100,000 in tax.

Details

INTERIOR AND FURNISHINGS

Your apartment in MAX HÖFE lets the sunshine in: the generous windows not only brighten your home, but your mood as well. The spacious rooms with their long visual axes enable the effects of daylight to unfold impressively. Additionally, they feature open-plan living areas and create space for you to tailor your home to your taste and to implement refreshingly different interior design concepts. MAX HÖFE makes it easy for you. For example with electric shutters or a smart-home system as standard. After all, it’s the little conveniences in everyday life that make you feel at home – and that define the cozy character of MAX HÖFE.

Inquire now

INTERIOR

THOMAS MANG STUDIO

Thomas Mang Studio is responsible for the design of selected apartments in the MAX HÖFE. In order to take into account the individual tastes and personal preferences of the buyers, the new owners can opt for one of three exquisite styles on special request. This option guarantees that each apartment is not only functional, but also aesthetically perfectly coordinated.

Inquire now
17 Immobilien gefunden
Whg. Nr. ↕ Immobilienart ↕ Etage ↕ Zimmer ↕ Fläche ↕ Kaufpreis ↕ Details
11-03 Wohnung EG 2 Zi. 74,57 m² 1.495.000 EUR Ansehen Inquire
11-05 Wohnung EG 2 Zi. 78,62 m² 1.695.000 EUR Ansehen Inquire
11-07 Wohnung EG 2 Zi. 89,97 m² 1.995.000 EUR Ansehen Inquire
11-08 Wohnung EG 4 Zi. 171,24 m² 3.995.000 EUR Ansehen Inquire
11-11 Wohnung 1. OG 2 Zi. 51,12 m² 995.000 EUR Ansehen Inquire
11-12 Wohnung 1. OG 2 Zi. 49,66 m² 975.000 EUR Ansehen Inquire
11-13 Wohnung 1. OG 2 Zi. 64,44 m² 1.295.000 EUR Ansehen Inquire
11-14 Wohnung 1. OG 3 Zi. 127,26 m² 2.995.000 EUR Ansehen Inquire
11-17 Wohnung 1. OG 3 Zi. 81,99 m² 1.995.000 EUR Ansehen Inquire
11-19 Wohnung 2. OG 2 Zi. 72,65 m² 1.695.000 EUR Ansehen Inquire
11-21 Wohnung 1. OG 2 Zi. 77,12 m² 1.995.000 EUR Ansehen Inquire
11-35 Wohnung 3. OG 4 Zi. 124,32 m² 3.195.000 EUR Ansehen Inquire
11-43 Wohnung 3. OG 4 Zi. 166,00 m² 4.675.000 EUR Ansehen Inquire
11-45 Wohnung 3. OG 4 Zi. 140,75 m² 4.195.000 EUR Ansehen Inquire
11-56 Wohnung 5. OG 6 Zi. 195,92 m² 5.895.000 EUR Ansehen Inquire
11-59 Wohnung 5. OG 5 Zi. 185,74 m² 6.995.000 EUR Ansehen Inquire
11-61 Wohnung 6. OG 3 Zi. 158,62 m² 6.295.000 EUR Ansehen Inquire
Vormerken lassen

Available |     Reserved

WHERE THE CITY TOUCHES YOUR SOUL

June 2026

Current building progress

Window installation is now complete. Roofing work is in full swing. Interior and mechanical/electrical work has already begun. Facade work is in full swing.
November 2025

Current building progress

The windows have already been installed in the completed shell sections; the last shell section will be completed in February 2026. With the start of interior work, a new chapter in the history of this modern ensemble begins.
July 2025

Current building progress

At the Max Höfe construction site, the current focus is on the construction of the building shell, which is currently underway.
May 2025

Current building progress

The construction site is growing rapidly: the shell has already reached the second floor.
March 2025

Current building progress

Work on the basement floors has been completed.
October 2024

Current building progress

Concrete is currently being poured for the basement levels. A total of 72 generously designed individual parking spaces equipped with wall boxes are being created here. There is also a parking space with a fast charging station in the underground garage, which is available for use by all residents.
July 2024

Current building progress

The foundations for the two building construction cranes have been completed on the construction site at Türkenstrasse 50. Construction of the floor slab is in full swing. We were able to gain Haseitl, a traditional and renowned family business from the Oberland region, as a partner for the building construction.
February 2024

Current building progress

The foundation stone has been laid, heralding the start of the shell construction. Over the next few weeks, the construction site will be set up by the contracted specialist company and the building will begin to grow.
October 2023

Current building progress

The next anchor layer is set.
September 2023

Current building progress

Excavation of the 2nd basement level has begun.
April 2023

Current building progress

The animal construction work is now in full swing.
February 2023

Current building progress

Things are also happening at MAX HÖFEN. After the planning phase and building permit, the water law approval has now been obtained and we are starting with the civil engineering work.
MAXHÖFE
- MAXVORSTADT -
Türkenstraße Karolinenplatz Karlsplatz Pinakothek der Moderne Akademie der Bildenden Künste Siegestor Universität/LMU Odeonsplatz Marienplatz Isar Hofgarten Englischer Garten

More projects

WE LOOK FORWARD TO HELPING YOU

Please add 3 and 9.

Contact

X
T +49 89 540 42 67 31

Mo.-Thu. 9.00 - 17.30 Uhr
Fr. 9.00-15.30 Uhr